Technical Reports have been prepared as part of the B&P Tunnel Project. These reports describe existing environmental resources within the study area and present the potential impacts the project may have on each of the resources. Technical reports were prepared in support of the Draft Environmental Impact Statement (DEIS) and Final Environmental Impact Statement (FEIS).

FEIS Technical Reports (June/July 2016)

DEIS Technical Reports (November 2015)

Go to top